PAINTEDGroup
Robotic spray line coating cabinet doors in the Painted workshop

Our work

Our work

Jobs we have actually done

Every job below left our Croydon workshop. Where we resprayed something, the before shot is there too — drag across the picture and judge it for yourself.

Kind of work

Room

Tired oak-effect kitchen before resprayingThe same kitchen resprayed in deep green satinBeforeAfter

Shaker kitchen brought back to new, South Croydon — drag across the picture to compare.

Spray finishing · Kitchen · South Croydon

Shaker kitchen brought back to new

Twenty-two doors and six drawer fronts resprayed off site in three days.

What was there
A tired oak-effect kitchen the family liked the layout of and did not want to rip out.
What we made
Doors, drawer fronts and end panels taken off, sprayed in our booths and rehung, with new hinges and soft-close dampers.
Materials
Existing MDF and oak-veneer doors, new hardware
Finish
Two-pack satin, colour matched to a Farrow & Ball reference
How long
Three working days off site, one day to refit
Ask for something like this
Bedroom before the fitted wardrobes went inThe same wall with sprayed fitted wardrobesBeforeAfter

Wall of fitted wardrobes, Purley — drag across the picture to compare.

Bespoke joinery · Bedroom · Purley

Wall of fitted wardrobes

Four bays, floor to ceiling, built around a chimney breast that was out of square.

What was there
A bedroom losing a metre of floor to two freestanding wardrobes.
What we made
Four bays with hanging, shelving and drawer banks, scribed to the wall and ceiling line.
Materials
18mm moisture-resistant MDF carcases, MDF shaker doors
Finish
Sprayed off site in eggshell before fitting
How long
Five weeks from survey to fitted
Ask for something like this
Panelled media wall with a floating oak shelf and closed base cupboards
Media wall with hidden storage, Beckenham

Bespoke joinery · Living room · Beckenham

Media wall with hidden storage

A full chimney-breast wall with cable routes, vents and a lift-off panel for the amplifier.

What was there
An awkward alcove either side of a chimney breast with trailing cables.
What we made
Panelled wall, floating shelf, closed base units and a ventilated cupboard for the kit.
Materials
MDF carcases and panelling, solid oak shelf
Finish
Sprayed matt, oak shelf oiled
How long
Four weeks
Ask for something like this
Alcove bookcases with adjustable shelves and beaded cupboard doors
Alcove bookcases either side of a fireplace, Dulwich

Bespoke joinery · Study · Dulwich

Alcove bookcases either side of a fireplace

Two matching bookcases with adjustable shelves and cupboards below.

What was there
Two empty alcoves in a Victorian front room, neither the same width.
What we made
Pair of bookcases scribed to the plaster, with beaded doors on the lower cupboards.
Materials
18mm MDF, solid timber shelf edges
Finish
Sprayed eggshell in a warm off-white
How long
Three weeks
Ask for something like this
Framed hall panelling with a bench seat and coat hooks
Hall panelling and a bench seat, Bromley

Bespoke joinery · Hall · Bromley

Hall panelling and a bench seat

Panelling up the stairs with hooks, a bench and shoe storage under it.

What was there
A narrow hall taking a beating from school bags and wet coats.
What we made
Framed panelling, bench with a lift-up lid, and a run of hooks on a solid rail.
Materials
MDF panelling, solid ash rail
Finish
Sprayed satin, hard-wearing where hands land
How long
Two and a half weeks
Ask for something like this
Primed internal doors before sprayingThe same doors after spraying in satin whiteBeforeAfter

Thirty internal doors sprayed in a week, Sutton — drag across the picture to compare.

Spray finishing · Commercial · Sutton

Thirty internal doors sprayed in a week

A whole block of flats, doors sprayed flat in the booths and delivered by floor.

What was there
New primed doors that a brush finish would have ruined.
What we made
Doors sprayed both faces and all edges, wrapped in pairs and delivered floor by floor.
Materials
Factory-primed internal doors supplied by the contractor
Finish
Two-pack satin white, sprayed flat
How long
Five working days
Ask for something like this
Chipped sideboard before resprayingThe same sideboard resprayed and clear coatedBeforeAfter

Family sideboard given a second life, Croydon — drag across the picture to compare.

Spray finishing · Living room · Croydon

Family sideboard given a second life

Stripped, filled, sprayed and back in the room the same week.

What was there
A solid sideboard with a chipped lacquer top the owner did not want to lose.
What we made
Stripped back, dents filled, sprayed in colour with a clear coat over the top.
Materials
Solid timber and veneer
Finish
Colour coat with a clear satin over it
How long
Four working days
Ask for something like this
Cut and edged cabinet parts stacked and labelled by cabinet
Cabinet parts for a shopfitter, Croydon

Trade manufacturing · Commercial · Croydon

Cabinet parts for a shopfitter

Nested, drilled, edged and labelled to the fitter's own part names.

What was there
A shopfit with sixty carcases due on site in a fortnight.
What we made
Parts cut on the beam saw, drilled on the router, edged and labelled per cabinet.
Materials
18mm melamine-faced chipboard, matching ABS edging
Finish
Factory melamine, no site finishing needed
How long
Six working days
Ask for something like this

The finishes in this work

From dead matt to mirror gloss

Dead matt

2–5% sheen. Soft and architectural, hides reflection.

Matt

10% sheen. The everyday choice for a painted kitchen.

Eggshell

20–30% sheen. Wipeable and forgiving.

Satin

40% sheen. Warm depth without glare.

Gloss

70–80% sheen. Crisp reflection, denibbed by hand.

Mirror gloss

90% and above. Polished flat, for feature pieces.

Have a drawing, or just a photograph?

Send whatever you have. We will come back with a price, a lead time and an honest answer about whether we can hit your date.