Trade Manufacturing
Veneer laid up and pressed onto board
Leaves stitched, laid up and pressed onto board, flat and matched.
What this is
We stitch veneer leaves into sheets, lay them up and press them onto your chosen substrate. Both faces are balanced so the panel stays flat, and the match is set out on the bench before anything goes near the press.
- Matching set out — Book, slip or quarter match, laid out and photographed for approval.
- Balanced panels — A backing veneer every time, so the sheet does not bow.
- Sequence kept — Panels numbered so a run of doors reads across the wall.
- Pressed properly — Heat and pressure held to the glue spec, not rushed.

On the floor
How veneer bonding & stitching runs here
Leaves stitched, laid up and pressed onto board, flat and matched. Leaves are stitched to your setting-out, pressed with heat, and backed so the panel stays flat.
- Panel size
- Up to 3,050 × 1,530mm
- Substrates
- MDF, MR MDF, ply, chipboard
- Veneers
- Oak, walnut, ash, fumed and dyed, plus your own
Why this matters
Why people use us for veneer bonding & stitching
What you actually get out of putting veneer bonding & stitching through us, rather than a price list.
- 01
Grain that runs as drawn
Leaves are stitched and laid up to your setting-out, so a book-match runs across the doors and not past them.
- 02
Flat, and it stays flat
Panels are pressed in our own JOOS press with balancing veneer on the back, so they do not bow later.
- 03
Your veneer or ours
Send your own bundle or let us source oak, walnut, fumed and dyed leaves to your sample.
- 04
Lacquered in the same building
Pressed panels can go straight into the spray shop, so nothing is handled twice or marked in transit.
How it goes
Laid up, pressed, balanced
Leaves are stitched to your setting-out, pressed with heat, and backed so the panel stays flat.



How it fits our process
One programme, start to finish
Where veneer bonding & stitching sits in the run, and what happens either side of it in the same building.
- Stage 1
Drawings and pricing
You send a DXF, a model or a sketch. We redraw if needed and price it in writing.
- Stage 2
Board cut to size
Sheets cut on the beam saw, nested for yield.
- Stage 3
Machined and drilled
Routed, drilled and grooved on the 5-axis and vertical CNC machines.
- Stage 4
Edged, veneered, assembled
Tape applied and pressed work bonded before the bench builds it.
You are here - Stage 5
Sprayed and delivered
Finished in our booths, checked, wrapped and brought to site on our vans.
Questions we are asked
Can I send my own veneer?
Yes. We check the leaves for splits and tell you how many usable sheets you will get before we start.
Do you finish the panels too?
We can lacquer them in our own booths, which keeps everything under one order.
How big a panel can you press?
Up to 3,050 × 1,530mm in the JOOS press. Larger faces are set out as joined panels with the joint placed where it is least seen.
Will a veneered panel stay flat?
Yes, provided it is balanced. We press a backing veneer on the reverse as standard, which is what stops a panel curling.
Often ordered with this

What it costs
Prices and dates for veneer bonding & stitching
Twelve book-matched oak veneered panels, pressed and balanced. That is a guide taken from work we have actually run — your own price for veneer bonding & stitching is confirmed in writing once we have the sizes or the drawings, and the date we give you is the date we hold.
- Rough price
- From about £145 plus VAT a panel
- How long
- 5 to 8 working days including lay-up
- Invoiced by
- Painted Bespoke Joinery Ltd
Proof
Recent work of this kind




Next step
Tell us what you need
Send drawings, sizes or photographs and we will price it in writing, usually within two working days. If it is quicker to talk it through, call 020 8944 2817 and you will get someone who knows the machines.
What we need, what you get
Send sizes, materials and the finish you want — drawings in any form, or photos and a few measurements. Back you get a fixed written price, a date we hold to, and the work delivered to site on our own vans from our workshop in Croydon.
Machining, finishing and assembly all happen in the same building, so nothing waits on another supplier and nothing gets damaged being moved between them.
See the machinery